{"id":852,"date":"2026-04-17T08:49:58","date_gmt":"2026-04-17T08:49:58","guid":{"rendered":"https:\/\/krolmap.com\/proyectos\/sin-categoria\/centro-de-datos-con-generacion-energetica-hibrida-25-mw-fase-1\/"},"modified":"2026-04-27T11:12:10","modified_gmt":"2026-04-27T11:12:10","slug":"data-center-with-hybrid-energy-generation-25-mw-phase-1","status":"publish","type":"proyectos","link":"https:\/\/krolmap.com\/en\/proyectos\/data-centers\/data-center-with-hybrid-energy-generation-25-mw-phase-1\/","title":{"rendered":"Data Center with Hybrid Energy Generation (25 MW \u2013 Phase 1)"},"content":{"rendered":"\n<img loading=\"lazy\" decoding=\"async\" width=\"1195\" height=\"777\" class=\"gb-media-f6116cb9\" alt=\"\" title=\"Proyecto 2\" src=\"https:\/\/krolmap.com\/wp-content\/uploads\/2026\/04\/Proyecto-2.webp\" srcset=\"https:\/\/krolmap.com\/wp-content\/uploads\/2026\/04\/Proyecto-2.webp 1195w, https:\/\/krolmap.com\/wp-content\/uploads\/2026\/04\/Proyecto-2-300x195.webp 300w, https:\/\/krolmap.com\/wp-content\/uploads\/2026\/04\/Proyecto-2-1024x666.webp 1024w, https:\/\/krolmap.com\/wp-content\/uploads\/2026\/04\/Proyecto-2-768x499.webp 768w\" sizes=\"auto, (max-width: 1195px) 100vw, 1195px\" \/>\n\n\n\n<p style=\"font-size:20px\"><strong>Client<\/strong><\/p>\n\n\n\n<p><strong>Developer:<\/strong> Krolmap E&amp;S, S.L.<strong><br>Technical support: <\/strong>Dexmah Ltd.<\/p>\n\n\n\n<p style=\"font-size:20px\"><strong>Context<\/strong><\/p>\n\n\n\n<p>Krolmap is promoting the development of a new data center in the Aragon region, conceived from the outset with a focus on energy self-sufficiency and the transition towards clean energies.<\/p>\n\n\n\n<p>The initial phase of the project envisages a capacity of 25 MW, with on-site generation based on natural gas and a defined strategy for evolution towards biogas and green hydrogen.<\/p>\n\n\n\n<p>In a context of increasing electricity grid congestion, this solution enables the project to be unblocked and accelerated through an alternative energy approach, aligned with the transition towards more sustainable energies.<\/p>\n\n\n\n<p style=\"font-size:20px\"><strong>Challenge<\/strong><\/p>\n\n\n\n<p><strong>Developing a critical infrastructure capable of:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Guaranteeing high energy availability <\/li>\n\n\n\n<li>Reducing grid dependency <\/li>\n\n\n\n<li>Integrating current solutions with future technologies <\/li>\n\n\n\n<li>Preparing the system for a progressive transition towards clean energies<\/li>\n<\/ul>\n\n\n\n<p style=\"font-size:20px\"><strong>Intervention<\/strong><\/p>\n\n\n\n<p>Krolmap, as developer, together with the technical support of Dexmah, has defined a comprehensive energy solution based on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>On-site distributed generation <\/li>\n\n\n\n<li>Flexible and scalable architecture <\/li>\n\n\n\n<li>Medium and long-term energy transition strategy <\/li>\n\n\n\n<li>Integration with the Data Center&#8217;s critical systems<\/li>\n<\/ul>\n\n\n\n<p style=\"font-size:20px\"><strong>Key Findings<\/strong><\/p>\n\n\n\n<p>The project demonstrates the viability of energy-independent data centers, designed from the outset to evolve towards more sustainable models.<br>The key lies in combining operational reliability with planning that allows for future technological adaptation.<\/p>\n\n\n\n<p style=\"font-size:20px\"><strong>Result<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Definition of a robust energy model for 25 MW IT <\/li>\n\n\n\n<li>Reduced dependency on the electricity grid <\/li>\n\n\n\n<li>Acceleration of project development <\/li>\n\n\n\n<li>Foundation prepared for the integration of green hydrogen<\/li>\n<\/ul>\n\n\n\n<p style=\"font-size:20px\"><strong>Added Value<\/strong><\/p>\n\n\n\n<p>Krolmap, with the support of Dexmah, drives solutions that combine engineering and energy innovation, developing future-ready infrastructure.<\/p>\n","protected":false},"featured_media":854,"menu_order":0,"template":"","format":"standard","meta":{"footnotes":""},"categoria_proyectos":[17,16],"class_list":["post-852","proyectos","type-proyectos","status-publish","format-standard","has-post-thumbnail","hentry","categoria_proyectos-data-centers","categoria_proyectos-industrial-engineering","resize-featured-image"],"_links":{"self":[{"href":"https:\/\/krolmap.com\/en\/wp-json\/wp\/v2\/proyectos\/852","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/krolmap.com\/en\/wp-json\/wp\/v2\/proyectos"}],"about":[{"href":"https:\/\/krolmap.com\/en\/wp-json\/wp\/v2\/types\/proyectos"}],"version-history":[{"count":1,"href":"https:\/\/krolmap.com\/en\/wp-json\/wp\/v2\/proyectos\/852\/revisions"}],"predecessor-version":[{"id":856,"href":"https:\/\/krolmap.com\/en\/wp-json\/wp\/v2\/proyectos\/852\/revisions\/856"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/krolmap.com\/en\/wp-json\/wp\/v2\/media\/854"}],"wp:attachment":[{"href":"https:\/\/krolmap.com\/en\/wp-json\/wp\/v2\/media?parent=852"}],"wp:term":[{"taxonomy":"categoria_proyectos","embeddable":true,"href":"https:\/\/krolmap.com\/en\/wp-json\/wp\/v2\/categoria_proyectos?post=852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}